Notice: Trying to access array offset on value of type bool in /data/sites/web/g9b98tb-hostingcom/sites/greenfeetdecorators.co.uk/wp-content/plugins/internal-link-building-plugin/internal_link_building.php on line 86
Notice: Trying to access array offset on value of type bool in /data/sites/web/g9b98tb-hostingcom/sites/greenfeetdecorators.co.uk/wp-content/plugins/internal-link-building-plugin/internal_link_building.php on line 105
Most of the gypsum had been removed from the walls. A 2.5 thick coarse Ty-Mawr hemp fat lime plaster was used. Mixed up with pozollan added to speed the set time because time was precious to lay the floor. A fine and super fine mix was put on top 5-6 days later. Two coats and only 4 days work. – Plaster boarding and gypsum probably would have taken longer! Phone was down and finishing pics to come soon.








